Pharmaceutical companies aim to achieveGMPFor the purpose of requirements, energy conservation, improving management level, and showcasing the modern image of the enterprise, automatic management of the air conditioning system in the production workshop is often carried out.
1The production workshopTemperature and Humidity ControlrequirementIndoor temperature should be controlled within the range required in summer20--24Celsius, winter18--22Celsius degree, control accuracy positive or negative2centigrade. The room humidity is controlled within45%--65%The air conditioning unit automatically starts and stops according to the working time period.
2、Implement logical control of air conditioning supply, ozone generator, and exhaust fan.
3、Zhijie TechnologyPrepare the display mode for the upper computer interface, tables, historical curves, historical data, and room temperature and humidity according to the requirements of Party A.
4Can set the transition between winter and summer seasons.
5All actuators can be operated soft on the upper computer and manually on the on-site control cabinet.
6The self-control system is reservedOPCCommunication interface, all dataParty AcompanyofMESThe production execution system is open.
