For the injection water storage and distribution system, set up three-level password protection to prevent illegal login to the system. Provide an on-site PLC control cabinet. The purpose of this control cabinet is to control the operation status of the circuit, so that it can operate correctly. The system has an electrical control system (1 set of PLC); The operating data of the system is stored in the storage area of the PLC, and the data can be set and read through the touch screen.
Install the control panel directly inside the control cabinet, which contains electrical equipment PLC & OIT。 This control system facilitates the operation, monitoring, and control of equipment by operators. The Operator Interface Terminal (OIT) is a monitoring panel that displays, alerts, and takes action on the operating parameters of the equipment. Sterilization steps, process set points, and process values are all displayed on the OIT.
Control components include liquid level sensors, flow sensors, temperature sensors, conductivity meters, frequency converters, pneumatic switching valves, and pneumatic regulating valves.
